PROJECTS

Project manager / designer / troubleshooter for hot air tunnels or shrink tunnels in the range 45-100 cycles / minute, length 4.5-9.5m especially for the beverage industry. Realized projects over 400 pieces worldwide.

Production line for silicone-coated transport chain rods and rod chain transport for hot air tunnels as well as spare parts (transport chain rod). Special feature, no or very little length expansion of the silicone tube cover due to a special manufacturing process.

Construction of a U-shaped immersion bath washer for beverage crates with 180 ° upward conveyor for a well-known brewery in the Upper Palatinate. Special feature: Width adjustment for the containers in the U-shaped immersion bath.

Development of the world's first 4-wheel washing system for car wheels. As a result → Establishment of Performtec GmbH in 2003. Plants across Europe, turnover approx. € 3 million
→ Sale of the GmbH share in 2018.